Transmission journeyman training is intended for experienced line workers who have completed the D-B series. This level of training offers more intensive details, topics and skills.

A Level - Four Levels (two classroom and two field)

A100 Level (five-day classroom)

  • Blasting/drilling pole holes
  • Installing screw anchors
  • Installing a Malone anchor
  • Installing a bridge –Strand anchor
  • Installing a Dome anchor
  • Installing a Grillage anchor
  • Excavating and sloping/shoring tower footers
  • Erecting tower structures
  • Erecting a 765kV aluminum structure
  • 138/345 kV steel pole (energized) insulator replacement

A100 Level (five-day field)

  • Installing tower footers
  • How to operate a puller
  • How to operate a tensioner
  • Meggers
  • The barehand work method
  • 765kV bonding on (bare-hand method)
  • Installing/removing 345kV dead-end insulators (double string) energized
  • Installing/removing dead-end insulators (double string)
  • Installing/removing 345kV suspension insulators (single string) energized
  • Installing/removing 345kV V-string insulatos (single string) energized

A200 Level (five-day classroom)

  • Conductor types (I.D./characteristics)
  • Pulling conductors
  • Dead–end 765kV conductors
  • Open loop shield wire installation and maintenance
  • Installing expanded anchors
  • Erecting a 765 kV structure
  • Aluminum/steel tower inspection
  • Inspecting new work
  • Checking phasing
  • Framing a multi-pole dead-end structure
  • Repairing earthen slips and slides

A200 Level (five-day field)

  • Installing/removing running corner insulators (double string) energized
  • Installing/removing dead-end insulators (single string) energized
  • Installing/removing suspension insulators (single string) energized
  • Installing/removing running corner insulators (single string) D-E
  • Installing/removing suspension insulators (4 bundle guyed V) energized
  • Splicing conductors
  • Sag wire
  • Installing/removing horizontal post insulators (single string) energized
  • Installing/removing vertical post insulators (single string) energized
Home
 
Distribution line
Transmission line (high voltage)
 
- Apprentice
- Journeyman
   
Underground
Substation
Protective relaying and electrical control
Custom training programs
 
back to top Click here to go back to the top of the page
Use of this site constitutes acceptance of the AEP Terms and Conditions.
© 1996-2005 American Electric Power. All Rights Reserved.
Advanced Search